Local Flexibility Market Platform

A digital marketplace that helps unlock cleaner, more resilient energy solutions.

AdobeStock

Project Overview

Updated November 24, 2026

The Problem

Growing pressure is being placed on Ontario’s electricity system. Population growth, electrification and technologies including electric vehicles, heat pumps, solar panels, and battery storage are creating new demands on electricity infrastructure. At the same time, evolving grid requirements are accelerating efforts to modernize infrastructure, enabling utilities to improve reliability, unlock greater efficiency from existing assets, and make data-driven investment choices. A modern, reliable electricity system is also foundational to economic growth, providing the grid capacity needed to support new housing, industry, manufacturing, transportation, and other major infrastructure investments in Ontario.

The evolving landscape of electricity use presents a significant opportunity to modernize our infrastructure. While traditional distribution projects face challenges with long lead times, risking short-term underbuilding, mismatched capacity, or slow delivery – which can lead to higher customer costs and reliance on temporary fixes –  a new approach allows us to meet Ontario’s future electricity needs more efficiently. By embracing new strategies, we can better manage planned infrastructure spending over the next two decades, ensuring timely connections and better aligning infrastructure with dynamic demand.

Distributed Energy Resources (DERs)—such as solar PV, battery storage, electric vehicles, and flexible loads are experiencing rapid growth. These assets have the potential to offer various benefits, including capacity relief, voltage support, congestion management, and outage mitigation.

How We Are Solving It

Four of Ontario’s largest utilities: Alectra Utilities Corporation, Electric Power Engineers, Hydro One Networks Inc., Hydro Ottawa Limited, and Toronto Hydro; are collaborating to establish Canada’s first multi-utility, digitally enabled flexibility market. This electricity distribution system initiative will help establish a secure digital marketplace and market framework that will soon enable the participating utilities to access and integrate services from local DERs, including demand response programs, local generation and energy storage, to help manage electricity demand and support grid reliability in the province.

The four participating utilities will work together to establish common rules, design how the market will operate, and develop the digital platform and supporting tools needed to run it. These tools will help utilities identify where and when grid flexibility is needed, evaluate potential solutions, and support local distribution system planning. Together, these elements aim to optimize existing infrastructure, support a more flexible and resilient electricity system, and maintain reliable service for the more than three million people across Ontario served by the four utilities.

Ultimately, the LFM project positions Ontario as a leader in transforming energy systems. Being a first of its kind, this project will establish a scalable, future-ready model for a multi-utility flexibility market. The project will create a blueprint for other provinces and countries to unlock flexibility within the distribution systems.

Project Lead

Project Partners

  • Untitled design ()
  • Untitled design ()
  • Untitled design ()